Tunnel Project Settings
This is the dialog where set up your tunnel project. Most of the functionality in Novapoint Tunnel uses the project information you specify in this dialog.
Find it here:
MOUS_ICO Menu: Tunnel > Tunnel Project Settings
MOUS_ICO Toolbar: Tunnel:
The tunnel project file holds the information of which tunnel geometry file that should be used together with a road project and a terrain model.
This dialog doesnít read the project setup from the general project ID in Novapoint, so you have to set up your project from scratch in this dialog.
The following tool buttons are available in this dialog:
Create a new tunnel project file or tunnel geometry file.
Open an existing tunnel project file, tunnel geometry file, road project file, or terrain model file
Save the tunnel project file
Delete the tunnel geometry file from the tunnel geometry file dropdown list in this dialog.
Note: You should make sure that the road- and terrain models specified in the Novapoint Project ID dialog are identical to the road- and terrain models specified in this dialog. The system does not set up this automatically.
Next topic: Volume Report