Railway Task in Quadri

Workflow

This task type is divided into two tabs, namely Task and Design. The general workflow in a task goes from left to right and a minimum of data is required  in the Task tab before continuing to the Design tab of pressing Finish to exit the task.

The minimum of data to add is


For the Novapoint Railway Task, many of the functions and buttons are similar to those of Novapoint Road Task.

The only Railway specific content is part of this documentation.

Next topic: Task