Novapoint 2022.FP2a

Release date: 07.03.2022

NOVAPOINT WATER AND SEWER

Construction (and export WS model as SOLID)

FIXED: When reading the WS model after the first save the pipes wall thickness is set to zero. It applies to pipes where the material SDR value set. This also caused error using “Export to 3D solid” function. This is now fixed.